This Week

  • Glass installation on the A2 South Tower continues; install of the pool and spa at the top of the building continues
  • Glass installation on the A1 North Tower continues; install of the pool and spa at the top of the building continues
  • Interior wall framing, drywall, cabinet and finish installation on the upper floors in the A2 South Tower continues
  • Interior wall framing and drywall continues in the A1 North Tower
  • D Building window install continues; elevator install is under way
  • Steel stud framing and exterior sheathing continues on E2 single-story retail building in front of the garage
  • C building interior wall framings in wall and above ceiling mechanical rough continues

Week of 9/3/18

  • Glass installation on the A2 South Tower will continue; install of the pool and spa at the top of the building will continue
  • Glass installation on the A1 North Tower will continue; install of the pool and spa at the top of the building will continue
  • Interior wall framing, drywall, cabinet and finish installation on the upper floors in the A2 South Tower will continue
  • Interior wall framing and drywall will continue in the A1 North Tower
  • D Building window install will continue; elevator install will continue
  • Masonry will start on E2 single-story retail building in front of the garage
  • C building interior wall framings in wall and above ceiling mechanical rough continues and install of new store front will start

Week of 9/10/18

  • Glass installation on the A2 South Tower will continue; install of the pool and spa at the top of the building will continue
  • Glass installation on the A1 North Tower will continue; install of the pool and spa at the top of the building will continue
  • Interior wall framing, drywall, cabinet and finish installation on the upper floors in the A2 South Tower will continue
  • Interior wall framing and drywall will continue in the A1 North Tower
  • D Building window install will be completed; elevator install will continue
  • Masonry will be completed and storefront install will start on E2 single-story retail building in front of the garage
  • C building interior wall framings in wall and above ceiling mechanical rough continues and install of new store front will start
  • We will be closing the alley behind the D building to install new pavement in the alley; see logistics plan for details
  • Curb and sidewalk replacement will start on the South side of Lincoln from Orchard to Fullerton and down Halsted; see logistics plan for details

Thank you for your continued patience and understanding as construction of Lincoln Common progresses. Please visit LincolnCommon.com for additional project details.